Design Rail - Installations


Installing the DesignRail® Aluminum Railing System is easy.

Important Note: Building codes vary by city and county; therefore, following the installation and railing design instructions detailed on this website does not necessarily ensure code compliance in all areas. So, before starting your project, be sure to consult your building department on local requirements for using and installing railings.

Detailed instructions for horizontal cable installation in pdf format
Detailed instructions for picket installation in pdf format
Detailed instructions for glass installation in pdf format
Detailed instructions for vertical cable installation in pdf format


Tools Needed:

  • Pencil
  • Measuring Tape
  • String Line
  • Level
  • Electric Drill
  • Drill Bits
  • Phillips & #2 Square (Robertson) Driver Bits
  • #27 Torx bit (only needed if assembling base plates to post material)
  • File
  • Rubber Mallet
  • Socket Wrench
  • Pliers
  • Miter Saw with Carbide Blade
  • Safety Glasses
  • Work Gloves
Installation is Easy!

Construct your rail frame in 5 simple steps.

step 1 <click to see the larger version>

Install Posts:


Install the posts starting with the end and corner posts and then continuing on to the intermediate posts. Be sure all are plumb and level.
step 2 <click to see the larger version>

Attach Cap Rails:


Measure and cut the Cap Rails and attach to posts using screws.
step 3 <click to see the larger version>

Screw On RCBs:


Screw the Rail Connecting Blocks (RCBs) to the posts for attaching the Foot Rails. RCB size and location will vary depending on the type of infill used. Posts come with pre-drilled pilot holes.

RCB's are not necessary when using horizontal cable infill without Foot Rails.
step 4 <click to see the larger version>

Prepare Infill Supports:


Measure and cut Cap Infill Channels and Foot Rails for each panel section.
step 5a <click to see the larger version>

Install Picket Infill:


Screw pickets to the Cap Infill Channel and Foot Rail. Then lift the complete panel into position on the railing frame and screw in place. Pickets shipped cut to size. Detailed instructions for picket infill installation in pdf format.
step 5b <click to see the larger version>

Install Glass Infill:


Attach Cap Infill Channel and Foot Rail to railing frame. Lift the pre-cut panes into the Cap Infill Channel, then lower into final position in Foot Rail slot. Detailed instructions for glass infill installation in pdf format.
step 5c <click to see the larger version>

Install Horizontal Cable Infill (with Foot Rail):


Screw intermediate pickets to Cap Infill Channel and Foot Rail, then lift into position on frame and screw in place. Lace cables through pre-drilled holes in posts and pickets, then tighten and trim.

Must have either a post or picket at least every 3 feet.

Horizontal cables shipped in standard assembly lengths which can be trimmed to size in the field. Detailed instructions for horizontal cable installation in pdf format.
step 5d <click to see the larger version>

Install Vertical Cable Infill:


Screw intermediate pickets to Cap Infill Channel and Foot Rail and loosely attach cables. Lift entire panel into position on railing frame and screw in place. Tighten nuts at bottom for final cable tension.

Must have either a post or picket after every 6th cable.

Vertical cable assemblies shipped prefabricated to exact size. Detailed instructions for vertical cable installation in pdf format.
step 5e <click to see the larger version>


Install Horizontal Cable Infill (without Foot Rail):


Screw intermediate pickets to Cap Infill Channel and then snap Channel into bottom of Cap Rail. Attach pickets to deck (picket surface mounting or picket fascia mounting). Lace cables through pre-drilled holes in posts and pickets, and then tighten and trim.

Must have either a post or picket at least every 3 feet.

Horizontal cables shipped in standard assembly lengths which can be trimmed to size in the field. Detailed instructions for horizontal cable installation in pdf format.

   
U.S. Rigging Supply • 1600 East Mc Fadden Avenue, Santa Ana, CA 92705 • Tel. (714) 545-7444 • Fax (714) 545-3311
| Home | Anchors - Tree Guy | ANSI Products | Architectural Railing/Cable Rail | Cable & Cable Assemblies | Fiber Ropes | Fiddle Block & Flip Lines |
| Gripples | Halyard Kits | Hardware - Climbing, Safety, Marine and Rigging | KONG Products | Swage Sleeves - Oval & Stop Sleeves | Tools | Wire Rope |